Rent
Fixed in the proposal and the lease
- Tenge per m² per month, excluding VAT
- Depends on area, term and move-in date
- Indexation as set in the lease

Eight units from 6,315 to 9,505 m² in building A. Adjacent units combine. Racking installation from summer 2027, handover in Q3 2027.
Building A
Set the area and temperature and we light up the matching units. Fine-tune the option by hand and send it for a proposal.
Building A · phase A
Fine-tune the option: tap a unit to add or remove it.
Lease model
The rent is fixed in your personal proposal. It depends on the area, lease term, move-in date and the scope of unit fit-out.
Fixed in the proposal and the lease
At the management company's actual cost
Metered for your unit
In a triple-net lease every cost line is visible on its own, so you never overpay for services padded into the rent. Our proposal shows the total occupancy cost, not just the rent.
Request a proposalThe deal
Seven steps. The first three take a few days, so you quickly know whether a unit fits and what the space will cost.
Area, timing, temperature range. You can pick units right on the plan.
The site and construction progress, or an online presentation with the executive director.
Rent, operating costs, schedule and the total occupancy cost.
Agreeing the key terms and the units.
The handover date and guarantees are written into the lease.
Racking and equipment installation before handover.
Phase A handover and start of operations.
Guarantees
The Eurasian Development Bank finances the first phase. For a tenant this guarantees that construction will be completed.
The developer's obligations to the tenant are written into the lease.
Griffin's own management company runs the park 365 days a year, 24/7.
Griffin Partners has developed and manages more than 500,000 m² of class A warehouses.
Questions
Yes, adjacent units combine, along a row and across the building. Units 3 and 4 give 16,740 m²; units 4 and 8 make a 17,875 m² through unit with docks on both sides.
In summer 2027, before phase A is handed over in Q3 2027.
It depends on the area, term, move-in date and fit-out. Our proposal calculates the total occupancy cost, not just the rent.
Yes. An additional chiller connects to the unit's ventilation system and supplies cooled air to the warehouse. Multi-temperature zones are delivered as built-to-suit.
Griffin's own property management company.
Consider built-to-suit: a warehouse to your brief in 12–14 months from approved brief to handover.
Yes. The park will have its own drone pad for small-parcel delivery over the Alatau City network. More on the Alatau City page.
Leasing enquiries

We use analytics cookies to understand how the site is used. The analytics counter loads only after you consent.
Preferences saved