Eight units from 6,315 to 9,505 m² in building A. Adjacent units combine. Racking installation from summer 2027, handover in Q3 2027.

Building A

Pick your
units

Set the area and temperature and we light up the matching units. Fine-tune the option by hand and send it for a proposal.

16 000 m²
Temperature
Move-in

Building A · phase A

Fine-tune the option: tap a unit to add or remove it.

Lease model

Triple net:
pay for actual costs

The rent is fixed in your personal proposal. It depends on the area, lease term, move-in date and the scope of unit fit-out.

Rent

Fixed in the proposal and the lease

  • Tenge per m² per month, excluding VAT
  • Depends on area, term and move-in date
  • Indexation as set in the lease

Operating costs

At the management company's actual cost

  • Security and access control 24/7
  • Cleaning and site upkeep
  • Building services maintenance
  • Property tax and insurance

Utilities

Metered for your unit

  • Electricity, heat, water
  • No mark-up hidden in the rent
  • 4.5 MW for the park, reliability category II

In a triple-net lease every cost line is visible on its own, so you never overpay for services padded into the rent. Our proposal shows the total occupancy cost, not just the rent.

Request a proposal

The deal

From enquiry
to move-in

Seven steps. The first three take a few days, so you quickly know whether a unit fits and what the space will cost.

  1. Enquiry

    Area, timing, temperature range. You can pick units right on the plan.

  2. Viewing

    The site and construction progress, or an online presentation with the executive director.

  3. Proposal

    Rent, operating costs, schedule and the total occupancy cost.

  4. Heads of terms

    Agreeing the key terms and the units.

  5. Lease

    The handover date and guarantees are written into the lease.

  6. Summer 2027Early access

    Racking and equipment installation before handover.

  7. Q3 2027Move-in

    Phase A handover and start of operations.

Guarantees

Why the date
will hold

EDB financing

The Eurasian Development Bank finances the first phase. For a tenant this guarantees that construction will be completed.

Guarantees in the lease

The developer's obligations to the tenant are written into the lease.

In-house property management

Griffin's own management company runs the park 365 days a year, 24/7.

Track record since 1998

Griffin Partners has developed and manages more than 500,000 m² of class A warehouses.

  • Huawei
  • DHL
  • X5
  • OSG
  • Bristol
  • NC Pharm

Questions

Frequently
asked

Can units be combined?

Yes, adjacent units combine, along a row and across the building. Units 3 and 4 give 16,740 m²; units 4 and 8 make a 17,875 m² through unit with docks on both sides.

When can racking installation start?

In summer 2027, before phase A is handed over in Q3 2027.

Why is the rent not on the website?

It depends on the area, term, move-in date and fit-out. Our proposal calculates the total occupancy cost, not just the rent.

Can the warehouse be cooled?

Yes. An additional chiller connects to the unit's ventilation system and supplies cooled air to the warehouse. Multi-temperature zones are delivered as built-to-suit.

Who will manage the park?

Griffin's own property management company.

Need more space or special requirements?

Consider built-to-suit: a warehouse to your brief in 12–14 months from approved brief to handover.

Will there be drone delivery?

Yes. The park will have its own drone pad for small-parcel delivery over the Alatau City network. More on the Alatau City page.

Leasing enquiries

Discuss
a lease

Send an enquiry

Your enquiry opens in your mail app or WhatsApp and goes straight to the executive director. We reply during business hours.

Privacy policy
CallDiscuss a lease